Le Pont Residences: A World-Class Condominium in Rosario, Pasig
I. About Le Pont Residences by RLC Residences
Master-planned condominium complex by RLC Residences
Located in Bridgetowne Destination Estate
Consists of 2 towers
Total of 644 units
Completion dates:
Tower 1: 2028
Tower 2: 2031
II. Features, Amenities, and Highlights
Unit Features:
Smart home devices
Work-from-home provisions
Engineered wood floors
Non-skid porcelain tiles
Facilities and Amenities:
Private theater
Jogging path
Pet park
Outdoor kids' play area
Indoor cycling room
Infinity pool
Private function room
Game room
Yoga room
Work lounge
Sky lounge and grilling area
Designed for comfort, convenience, work, and leisure
III. Why Le Pont Residences Is a Perfect Condominium Option
Combines:
High-quality finishes
Top-notch facilities
Strategic location between Pasig and Quezon City
Located within the 31-hectare Bridgetowne Estate
IV. Location
Nearby Commercial Areas:
Arcovia
Estancia
Robinsons Galleria
Shangri-La Plaza
SM Megamall
Nearby Schools:
Ateneo De Manila University
University of Asia and the Pacific
Miriam College
La Salle Greenhills
St. Paul College Pasig
Reedley International School
Lourdes School of Mandaluyong
Nearby Hospital:
The Medical City
V. How to Get to Le Pont Residences
Accessible via:
Bridgetowne Boulevard
Eulogio Amang Rodriguez Avenue
Near Pasig and Quezon City
Accessible by private car, ride-hailing services, and public transport (trains, buses, jeepneys)
VI. Financing Options
Accredited Banks:
Robinsons Bank
BPI
Metrobank
BDO
Maybank
PSBank
Unionbank
AUB
PNB
Chinabank
CBS
CTBC Bank
VII. About RLC Residences
Developer: Robinsons Land Corporation (RLC)
Portfolio includes: shopping malls, hotels, office spaces, residential projects, mixed-use properties
Tagline: “Raise, Live, & Connect”
Address: Bridgetowne East, North Drive corner Central Drive Avenue, Brgy. Rosario, Pasig City, Metro Manila
DHSUD LTS #:
Tower 1: 0001061
Tower 2: 0001062
Status: Pre-selling
Pets Allowed: Yes
Year Built: 2023 (Tower 1)
Launch Dates:
Tower 1: January 2023
Tower 2: July 2024
Completion Dates:
Tower 1: September 2028
Tower 2: September 2031